Uploaded image for project: 'FHIR Specification Feedback'
  1. FHIR Specification Feedback
  2. FHIR-35645

Typo in Paragraph 5 - point to point

    XMLWordPrintableJSON

Details

    • Icon: Technical Correction Technical Correction
    • Resolution: Persuasive
    • Icon: Highest Highest
    • US Hybrid/Intermediary Exchange (FHIR)
    • 0.1.0
    • FHIR Infrastructure
    • Exchange Routing CapabilityStatement - Destination Server
    • Specification
    • 1.1
    • Hide

      On Home page, section 1.1 Paragraph 5

       

      change "point to point" to "point-to-point"

      (2 instances)

       

      Show
      On Home page, section 1.1 Paragraph 5   change "point to point" to "point-to-point" (2 instances)  
    • Correction
    • Non-substantive
    • 0.1.0

    Description

      identified typo

      Existing Wording:

      Paragraph 5: "point to point" (2 instances)

      Proposed Wording:

      "point-to-point"

      (Comment 3 - imported by: Chris Shawn)

      Attachments

        Activity

          People

            Unassigned Unassigned
            jasonmccsmith Jason M. Smith (Inactive)
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: