Details
-
Change Request
-
Resolution: Persuasive
-
Very High
-
FHIR Core (FHIR)
-
STU3
-
FHIR Mgmt Group
-
Normative
-
Change Management & Versioning (versions/compatibility)
-
-
Grahame Grieve/John Moehrke: 6-0-0
-
Clarification
-
Non-substantive
-
STU3
Description
The description of maturity levels is focused on resource exchange. These maturity levels are also applied to determine "maturity" of terminology service operations (and other operations?) but they do not describe testing that makes sense for an operation. Instead of "tested and exchanged" I would assume for an operation it should be tested with acceptable error messages and content exchange. There needs to be more documentation of what the "5 independent production systems in more than one country" have done to document that the operations have been tested.
Attachments
Issue Links
- is voted on by
-
BALLOT-4843 Negative - Rob McClure : 2018-May-FHIR R4 INFRASRUCTURE R1
- Balloted